If you're taking possession of a new flat in Greater Faridabad, the order matters more than the budget: inspect and log defects first, decide what to keep second, and only then design and build. Under RERA, the builder must fix structural and workmanship defects you report within five years of possession, at no cost, within 30 days of notice (Housing.com). Those repairs are far easier to claim before your carpenter has covered the walls.

Key Takeaways

  • Inspect the flat and report defects in writing before any interior work starts. RERA gives you five years of defect liability.
  • Keep builder flooring, sanitaryware and fittings if they're sound. It frees budget for storage and lighting.
  • Check your society's rules on working hours, deposits and debris before fixing a start date.
  • A new 3BHK typically costs ₹24.8–41.3 lakh to fit out at 2026 pricing, depending on the finish grade.

What Should You Check at Possession?

Section 14(3) of the RERA Act makes the builder liable for structural defects and defects in workmanship, quality or services reported within five years of possession, and the builder can't contract out of it (Housing.com). Use that. Walk the flat with a checklist before you sign off, and send the defect list to the builder in writing.

AreaWhat to check
Walls and ceilingsCracks, damp patches, uneven plaster, hollow-sounding spots
FlooringLoose or hollow tiles (tap them), chipped edges, uneven levels
BathroomsWater pooling, slope to the drain, leaks under basins, seepage on the other side of the wall
PlumbingWater pressure at every tap, hot water lines, drainage speed
ElectricalEvery switch and socket, earthing, MCB labels, AC and geyser points
Doors and windowsAlignment, locks, gaps, glass, rain-water leaks at sills
Balconies and terraceSlope, drainage outlets, railing fixing
Possession inspection checklist for a new flat.

Do the water test before the monsoon if you can. Run the shower for ten minutes and check the wall on the other side, and the ceiling of the flat below if a neighbour will let you. Seepage found now is the builder's to fix. Seepage found after your wardrobe is fixed to that wall is yours.

What Should You Keep and What Should You Replace?

A new flat already contains a lot of paid-for work. Keeping sound builder items is one of the easiest ways to bring a ₹24.8–41.3 lakh 3BHK budget toward its lower end. Decide item by item.

  • Flooring: keep it if the tiles are sound and the colour works with your plan. Replacing a whole flat's flooring is expensive and dusty.
  • Sanitaryware and CP fittings: often worth keeping in newer societies. Upgrade taps and shower heads if you like, without breaking tiles.
  • Kitchen platform: many builders give a granite platform and sink. A modular kitchen can often be built around it, which saves the countertop cost.
  • Electrical points: keep the wiring, but plan where you need extra points before the design is final. Adding them later means chasing finished walls.
  • Doors: main and bedroom doors are usually fine. Refinishing is cheaper than replacing.

In newer Greater Faridabad flats, we usually recommend keeping the builder flooring and sanitaryware and putting that money into the kitchen, wardrobes and lighting. Those are the things a builder flat almost never gets right, and the things you'll use every day.

What Do Society Rules Mean for Your Timeline?

Many Faridabad societies restrict interior work to set hours and days, and some ask for a refundable deposit before work begins. Get the rules in writing from the RWA or maintenance office before you fix a start date. The usual ones are:

  • Working hours, and whether Sundays and holidays are allowed
  • A refundable damage deposit for lifts and common areas
  • Rules on debris removal and material storage
  • Lift booking for delivering carpentry and appliances
  • Registration and ID for workers

Shorter working days stretch the timeline and add supervision cost. A fit-out that takes eight weeks in an independent house can take noticeably longer in a society that allows only daytime weekday work.

In What Order Should the Interior Work Happen?

The order is the same in almost every flat, and getting it wrong is what causes rework. The most expensive mistake is fixing electrical points after the ceiling and wardrobes are designed around the wrong positions.

  1. Defect list to the builder, and wait for repairs.
  2. Measure and design: layout, furniture, kitchen, wardrobes, electrical and ceiling plans, all together.
  3. Civil and electrical changes: new points, conduits, any plumbing changes.
  4. False ceiling framing and boarding.
  5. Carpentry: kitchen, wardrobes, TV unit, installed on site.
  6. Painting, after the dusty work is done.
  7. Lights, fittings and appliances, then deep cleaning and handover.

Design can start as soon as you have the floor plan, even before possession. Finalising the design early means carpentry can begin soon after you get the keys.

How Much Does It Cost to Fit Out a New Flat?

Typical 2026 pricing puts a 2BHK interior at ₹16.5–27.5 lakh and a 3BHK at ₹24.8–41.3 lakh, before loose furniture and GST. A new flat usually lands in the lower half of those ranges, because the flooring, bathrooms and wiring are new.

The 3BHK interior design cost guide breaks the budget down room by room at three specifications, and the interior design cost guide for Faridabad covers every line item and how designer fees work. If you haven't picked a designer yet, start with how to choose an interior designer in Faridabad.

Moving into a new flat in Greater Faridabad?

See how we plan interiors for new society flats in Sectors 75–89.

Interior design in Greater Faridabad

Frequently Asked Questions

What should I check before starting interiors in a new flat?

Inspect walls, flooring, bathrooms, plumbing, electrical points, doors and windows, and report defects to the builder in writing. Under RERA the builder must fix defects reported within five years of possession.

How long is the builder liable for defects in a new flat?

Five years from possession under Section 14(3) of the RERA Act. The builder must fix reported structural and workmanship defects at no cost, within 30 days of notice (Housing.com).

Should I replace builder flooring in a new flat?

Only if it's damaged or clashes with your plan. Keeping sound flooring and sanitaryware frees budget for the kitchen, wardrobes and lighting.

How much does it cost to do interiors in a new 3BHK flat?

About ₹24.8–41.3 lakh at 2026 pricing for a 1,650 sq ft flat, before loose furniture and GST. New flats usually land in the lower half, because the flooring, bathrooms and wiring are new.